We put up about 200 sheets of drywall over the last 2 weeks and are almost done hanging, just 2 small bathrooms to go. Much of the work platform came down yesterday, and with drywall on the side walls of the great room you get a much better feel for the room. Drywall finishing should start in earnest the middle of next week. There are a lot of joints to tape, but it is a bit easier on the outside walls. With it being OSD on the inside the sheets can be hung up and down as 10′ sheets, so that means no butt joints, only edge joints running up and down every 4′